{"id":23951,"date":"2023-01-30t13:54:14","date_gmt":"2023-01-30t19:54:14","guid":{"rendered":"\/\/www.dicovercards.com\/?p=23951"},"modified":"2023-11-21t15:07:45","modified_gmt":"2023-11-21t21:07:45","slug":"full-depth-reclamation-offers-alternative-to-complete-roadway-reconstruction","status":"publish","type":"post","link":"\/\/www.dicovercards.com\/full-depth-reclamation-offers-alternative-to-complete-roadway-reconstruction\/","title":{"rendered":"full-depth reclamation offers alternative to complete roadway reconstruction"},"content":{"rendered":"
in today’s roadway repair environment, the practice of removing the old roadway material and replacing it with new is often impractical from the standpoint of cost and environmental impact. an increasingly useful alternative is known as full-depth reclamation<\/a> (fdr). fdr is a roadway reconstruction method that involves recycling the existing asphalt pavement structure and using it as the base for the new roadway. the team at snyder & associates has increasingly made use of this cost-effective and sustainable alternative to traditional roadway reconstruction. before explaining the fdr process, however, it\u2019s critical to discuss the benefits of fdr and when it\u2019s most appropriate to use this method over full removal and replacement.<\/p>\nbenefits of full-depth reclamation roadway repair<\/span><\/h2>\n