{"id":13272,"date":"2019-10-10t15:16:28","date_gmt":"2019-10-10t20:16:28","guid":{"rendered":"\/\/www.dicovercards.com\/?post_type=snyder-projects&p=13272"},"modified":"2022-04-18t11:42:17","modified_gmt":"2022-04-18t16:42:17","slug":"ankenys-new-civic-building-houses-library-council-chambers","status":"publish","type":"snyder-projects","link":"\/\/www.dicovercards.com\/projects\/ankenys-new-civic-building-houses-library-council-chambers\/","title":{"rendered":"ankeny\u2019s new civic building houses library & council chambers"},"content":{"rendered":"
when the city of ankeny first explored the idea of constructing a new library in 2010, opn architects explored designs for a civic building that would be located in the still-developing \u201cdistrict\u201d at prairie trail subdivision. the building was intended to provide space for a new city hall while at the same time double the size of the current 世界杯足球比赛预选赛
library. unfortunately, the project was shelved in 2014 due to a lack of funding<\/a>. but a subsequent $8.5 million bond referendum put to the voters in 2017 passed with an overwhelming majority of residents in support of the project. this money, in conjunction with civic trust funds and capital reserve funds, would be used for the new $15 million facility.<\/p>\n construction progresses with the completion of the steel framing for the building.<\/p><\/div>\n opn was able to quickly upgrade the nearly eight-year-old, original design concept by incorporating a few amenities to meet modern library trends, such as makerspaces and community rooms. 2022足球世界杯小组赛赛程
(a subsidiary of snyder & associates<\/a>) was brought on board to design all structural engineering<\/a> components of the plan. the architect\u2019s extensive use of precast concrete, glass, and steel framing made this a critical portion of the design process. additionally, snyder & associates performed the construction survey work<\/a> for the building and parking lot locations.<\/p>\n the 55,000 square foot structure consists of reinforced concrete foundations, structural steel framing with composite floor decking, metal roof decking, and architectural precast wall panels. large, interior atriums were central to the design, along with expansive outside views provided by glass curtain walls. the unique rooftop framing, in conjunction with the glass walls and atriums, allow for an abundance of natural light throughout much of the building. the lateral forces at work in this design are resolved through the use of steel x and k bracing frames and by utilizing the precast wall panels as shear elements. the final design results in a modern and efficient structure that blends seamlessly with the surrounding prairie trail development<\/a>.<\/p>\n<\/a>
extensive use of light and open space<\/strong><\/span><\/h2>\n
expanded amenities increase program options<\/strong><\/span><\/h2>\n