{"id":14905,"date":"2021-04-05t11:57:38","date_gmt":"2021-04-05t16:57:38","guid":{"rendered":"\/\/www.dicovercards.com\/?post_type=snyder-projects&p=14905"},"modified":"2023-09-20t10:05:35","modified_gmt":"2023-09-20t15:05:35","slug":"lift-station-upgrades-eliminate-backups-increase-efficiencies","status":"publish","type":"snyder-projects","link":"\/\/www.dicovercards.com\/projects\/lift-station-upgrades-eliminate-backups-increase-efficiencies\/","title":{"rendered":"lift station upgrades eliminate backups & increase efficiencies: anamosa"},"content":{"rendered":"
as community leaders in mature communities know, the need for new and more efficient wastewater systems<\/a> is a universal concern. this issue was an unwelcome reality for many anamosa residents near the 2nd street lift station. frequent sewage backups into homeowner’s basements had resulted in numerous insurance claim filings and additional expenses to the city. anamosa city leaders turned to the professionals with snyder & associates to tackle this concerning and costly problem.<\/p>\n as the designers of the city’s new wastewater treatment facility<\/a>, our team was intimately familiar with the current municipal systems in anamosa. after preparing upgraded facility plans and offering solutions to upgrade the aging infrastructure<\/a>, our experts collaborated with city staff to determine the most cost-effective and sustainable solution.<\/p>\n the preferred option involved upgrading the existing wastewater lift station and portions of the adjoining sanitary sewer collection system<\/a>. lift stations are pumping stations used to move wastewater from a lower elevation to a higher elevation and eventually to a treatment facility.<\/p>\n a new, precast structure was constructed to house the lift station apparatus. the facility’s capacity was increased from 800,000 gallons per day to over 2.4 million gallons per day. to meet current iowa department of natural resources (dnr) water quality design standards<\/a>, the new station is equipped with a three-pump system, where one serves as a backup. each of the three pumps is controlled by variable frequency drives, providing the pumps the capability to handle a wide range of pumping needs, ensuring operational efficiency. the plan also doubled the size of the force main piping, which extends over \u00bd mile along 2nd<\/sup> street to the west of the lift station.<\/p>\nupgrades increase lift station & force main capacity while improving efficiency & safety<\/strong><\/span><\/h2>\n
vertical wastewater filtration prevents clogging & potential damage<\/span><\/h2>\n