{"id":19277,"date":"2021-11-12t17:04:23","date_gmt":"2021-11-12t23:04:23","guid":{"rendered":"\/\/www.dicovercards.com\/?post_type=snyder-projects&p=19277"},"modified":"2022-04-26t13:32:04","modified_gmt":"2022-04-26t18:32:04","slug":"corporate-woods-drive-bridge-over-interstate-35-supports-new-development","status":"publish","type":"snyder-projects","link":"\/\/www.dicovercards.com\/projects\/corporate-woods-drive-bridge-over-interstate-35-supports-new-development\/","title":{"rendered":"corporate woods drive bridge over interstate 35 supports new development"},"content":{"rendered":"

key infrastructure component for continued growth & expansion<\/strong><\/span><\/h2>\n
\"under<\/a>

the special weathering steel used for the bridge beams does not require painting but instead develops a chestnut-colored patina.<\/p><\/div>\n

the rapid population growth in ankeny, iowa can in large part be attributed to its proximity to des moines and the easy access to interstate 35. to support new site development<\/a> on the southeast side of the city, expanding that efficient access was critical. the new iowa department of transportation (dot) driver\u2019s license station, several warehouse retail centers, hotels, and other commercial properties<\/a> were depending on roadway infrastructure<\/a> to support the increasing growth and vehicle traffic on the east side of the interstate.<\/p>\n

to quickly expand access in the area, a new interchange and bridge spanning the interstate at the corporate woods drive location were viewed as the optimal choice. the aggressive schedule desired by city leaders and iowa department of transportation (dot) officials required important decisions to be made quickly.<\/p>\n

the professionals with snyder & associates, along with subsidiary 2022足球世界杯小组赛赛程 <\/a>, were selected to partner with 世界杯足球比赛预选赛 works engineers from the city of ankeny, polk county, iowa dot staff from district 1, office of design, and office of bridges and structures. a cohesive team effort was an essential basis of collaboration for project 2022世界杯32强预选赛 and sound decision-making.<\/p>\n

unique bridge features for corporate woods drive interchange<\/strong><\/span><\/h2>\n

due to the grading at the interchange site, a significant amount of fill placement was required to achieve the new corporate woods drive roadway configuration. our team\u2019s extensive coordination with the geotechnical engineers helped identify the proper construction procedures and specifications to control the settlement of new roadway fill.<\/p>\n

the roadway alignment and geometry<\/a> were established early in the design process. this allowed the bridge design<\/a> team to immediately get started creating the plans for the steel plate girder bridge featuring a new aesthetic theme. the steel girder design was optimized for the required span lengths over interstate 35 and to provide proper clearance for interstate traffic below. other unique bridge features include:<\/p>\n