{"id":21299,"date":"2022-03-24t17:42:01","date_gmt":"2022-03-24t22:42:01","guid":{"rendered":"\/\/www.dicovercards.com\/?post_type=snyder-projects&p=21299"},"modified":"2022-04-26t11:43:24","modified_gmt":"2022-04-26t16:43:24","slug":"walnut-grove-subdivision-provides-new-housing-for-council-bluffs-neighborhood","status":"publish","type":"snyder-projects","link":"\/\/www.dicovercards.com\/projects\/walnut-grove-subdivision-provides-new-housing-for-council-bluffs-neighborhood\/","title":{"rendered":"walnut grove subdivision provides new housing for council bluffs neighborhood"},"content":{"rendered":"
the former walnut grove elementary school before demolition begins.<\/p><\/div>\n
the walnut grove elementary school dutifully served the north side of council bluffs for nearly nine decades. after a feasibility study conducted in the early 2010s concluded the building no longer met district standards, the school was closed in 2014. left to the ravages of mother nature, the deteriorating structure could have quickly become a blight concern for the surrounding residential area. instead, the city of council bluffs<\/a> purchased the vacant building in 2015 with the intention of transforming the city block for residential housing<\/a>.<\/p>\n first things first, however, required the removal of the old elementary school building. city leaders enlisted the team with snyder & associates to create a suitable demolition plan to tear down and remove the structure and the vast concrete parking lot and asphalt playground areas. this required strict adherence to protecting against erosion<\/a> and pollution in compliance with the iowa department of natural resources (dnr) npdes permits and the u.s. clean water act.<\/p>\n our team also developed a stormwater pollution prevention plan (swppp) to guide the contractor during the demolition phase. the demolition also required site restoration activities that included importing fill material and performing minor grading to restore the existing site topography and drainage patterns in the project zone. as a final detail, we prepared a subdivision plat for the south half of the block to include seven residential lots.<\/p>\n example of a standard home constructed in the walnut grove subdivision. photo credit: neighborworks home solutions<\/p><\/div>\n with the demolition work completed, the community-based non-profit, neighborworks\u00ae home solutions (nwhs)<\/a> purchased the remaining northern half of the block. neighborworks primary goal is the revitalization of neighborhoods<\/a> by creating quality housing choices. their team envisioned the construction of 14 single-family homes on the site of the former school building.<\/p>\n世界杯足球比赛预选赛
-private \u201cteam\u201d effort drives new residential subdivision<\/strong><\/span><\/h2>\n
<\/a>