{"id":2357,"date":"2017-10-26t15:28:55","date_gmt":"2017-10-26t20:28:55","guid":{"rendered":"https:\/\/snyder-associates.u5fz9z3h-liquidwebsites.com\/?post_type=snyder-projects&p=2357"},"modified":"2023-07-10t14:28:57","modified_gmt":"2023-07-10t19:28:57","slug":"ne-36th-street-reconstruction-bridge-widening","status":"publish","type":"snyder-projects","link":"\/\/www.dicovercards.com\/projects\/ne-36th-street-reconstruction-bridge-widening\/","title":{"rendered":"bridge widening & street reconstruction spotlight northeast 36th street upgrades"},"content":{"rendered":"

rural to urban roadway reconstruction<\/span><\/h2>\n
\"\"

crews work on the phase one bridge reconstruction efforts on northeast 36th street.<\/p><\/div>\n

over the past two decades, rapid population growth in\u00a0ankeny\u00a0has prompted the need for increased\u00a0traffic capacity and improved safety<\/a>, particularly\u00a0along northeast 36th<\/sup> street between north ankeny boulevard and northeast delaware avenue. in 2012, construction was finalized on the interstate 35\/northeast 36th<\/sup> street interchange project. while this project drastically changed the traffic patterns on the north side of ankeny, it was also the catalyst for transforming northeast 36th<\/sup> street from a rural, two-lane roadway to a four-lane urban boulevard with left-turn lanes and expansive pedestrian walkways and sidewalks<\/a>.<\/p>\n

as the design engineer for this ambitious project, snyder & associates (along with our subsidiary 2022足球世界杯小组赛赛程 <\/a>) provided\u00a0transportation, civil,\u00a0traffic, and\u00a0structural\u00a0bridge engineering services<\/a>. additionally, our team designed a stormwater wetland and water quality basin<\/a> located upstream from fourmile creek.<\/p>\n

phased construction process keeps traffic flowing<\/strong><\/span><\/h2>\n
\"\"

aerial view of phase one bridge reconstruction efforts on northeast 36th street.<\/p><\/div>\n

the northeast 36th<\/sup> street project has a strong regional impact due to its location and the surrounding transportation system. it\u2019s highlighted in the ankeny comprehensive plan as a municipal arterial, with plans to ultimately extend the roadway all the way west to u.s. highway 415 as traffic volumes dictate. our team was tasked with developing a plan for the delaware avenue to ankeny boulevard section in the most cost-effective manner possible. to achieve this goal, major components of the project were established for bidding and staging, including:<\/p>\n