{"id":2384,"date":"2018-06-05t15:32:18","date_gmt":"2018-06-05t20:32:18","guid":{"rendered":"https:\/\/snyder-associates.u5fz9z3h-liquidwebsites.com\/?post_type=snyder-projects&p=2384"},"modified":"2022-04-18t13:46:28","modified_gmt":"2022-04-18t18:46:28","slug":"johnston-high-school-stadium-complex","status":"publish","type":"snyder-projects","link":"\/\/www.dicovercards.com\/projects\/johnston-high-school-stadium-complex\/","title":{"rendered":"new high school building & stadium complex design for johnston community"},"content":{"rendered":"
johnston, iowa is a rapidly growing community located just north of des moines. between 2000 and 2013, the city\u2019s school district grew by over 2,400 students, prompting the need for a new high school and stadium complex.\u00a0both the high school and athletic complex<\/a> are among largest facilities of their kind in the state of iowa.<\/p>\n the new high school is a two-story building with three wings and 369,000-square-feet of space to accommodate up to 1,800 10th<\/sup>, 11th<\/sup>, and 12th-grade students. noteworthy features include retractable walls, improved access to lockers, common areas, and exits, along with a 1,200-seat auditorium and an 8,000 square foot fitness center, which can accommodate up to 96 students.<\/p>\n dragon stadium, the sports complex adjacent to the school, features a synthetic athletic field, all-weather track, and tennis courts. there is also discus, shot put, and long jump fields. the stadium has a fieldturf playing surface that’s ideal for use by both football and soccer teams as well as bands. with 5,300 seats, the athletic complex has plenty of seating space, a key improvement over the previous stadium. larger restrooms, concession stands, and locker rooms are additional improvements that will serve the high school well.<\/p>\n serving as the civil\u00a0engineer<\/a> and landscape architect for the project, snyder & associates provided expertise in pavement<\/a> design, stormwater management<\/a>, utility design, and landscape design. collaborating with johnston community schools, we worked to guide safe vehicle<\/a> and pedestrian circulation<\/a>. traffic consideration included normal school days and large athletic events.<\/p>\n two roundabouts near the primary entrance to the school were 世界杯足球比赛预选赛
street improvements<\/a> that we coordinated with the city of johnston. three primary access drives service the site. designated areas include:<\/p>\n project construction<\/a> began in may 2014 and concluded in april 2017, just in time for the start of the 2017-2018 school season.<\/p>\n collaboration between snyder & associates, stahl construction<\/a>, frk architects & engineers, and the johnston community and school district<\/a> were essential to project success.<\/p>\n","protected":false},"excerpt":{"rendered":" we provided expertise in pavement design, stormwater management, utility design, and landscape design for the new johnston high school and stadium complex.<\/p>\n","protected":false},"featured_media":7656,"template":"","categories":[26],"project_categories":[113,34],"client_type":[62],"location":[76],"class_list":["post-2384","snyder-projects","type-snyder-projects","status-publish","has-post-thumbnail","hentry","category-世界杯足球比赛预选赛
-spaces","project_categories-education","project_categories-athletic-facilities","client_type-design-professional","location-ankeny"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t\n\t\n\t\n\t\n\t\n\t\n\n\t\t\ncreating safe & efficient traffic circulation<\/span><\/h2>\n
\n