{"id":24311,"date":"2023-04-05t16:49:17","date_gmt":"2023-04-05t21:49:17","guid":{"rendered":"\/\/www.dicovercards.com\/?post_type=snyder-projects&p=24311"},"modified":"2024-03-13t16:55:04","modified_gmt":"2024-03-13t21:55:04","slug":"cedar-heights-drive-reconstruction-continues-cedar-falls-corridor-upgrades","status":"publish","type":"snyder-projects","link":"\/\/www.dicovercards.com\/projects\/cedar-heights-drive-reconstruction-continues-cedar-falls-corridor-upgrades\/","title":{"rendered":"cedar heights drive reconstruction continues cedar falls corridor upgrades"},"content":{"rendered":"
crews pour new concrete for the sidewalk system along cedar heights drive.<\/p><\/div>\n
for several years, the cedar falls<\/a> community has been expanding its transportation network<\/a> along the southern edge of town, including the greenhill road corridor. this work was completed to accommodate new commercial and residential development<\/a> in the area and to provide commuters with another route through town. piggybacking on the success of the traffic study<\/a> that resulted in the greenhill road improvements, our team was again tasked with improving the cedar heights drive corridor, extending south from greenhill road to the viking road intersection.<\/p>\n before reconstruction, the existing cedar heights drive corridor consisted of a two-lane rural section that was a main thoroughfare for commuters and a primary access route to the john deere facility on the south side of town. this comprehensive project included reconstructing the entire roadway to a three-lane urban section (with a two-way, left-turn lane), adding an extensive storm sewer system, building a trail, and extending the sanitary sewer and water main.<\/p>\n beginning at the greenhill road intersection, this project converted the existing signalized intersection to a multi-lane roundabout configuration. the existing t-intersection was converted to a single-lane roundabout at the huntington road intersection. additionally, a truck apron and landscape features were added to the viking road roundabout at the south end of the project zone. the use of roundabouts will drastically improve the traffic flow along the corridor and increase safety.<\/p>\n these improvements significantly impacted the cedar heights drive and greenhill road areas. the cedar heights drive reconstruction south from the intersection with viking road and north past the intersection with greenhill road, along with the construction of the roundabouts, was divided into two segments, beginning with the greenhill road roundabout. this staging effort allowed traffic access at the huntington road intersection while work was performed to the north.<\/p>\n in addition to the roadway reconstruction and widening, this project also saw the construction of a recreational trail running adjacent to the roadway, a new water main, sanitary sewer main, and storm sewer main were included from the east viking road roundabout north and east through the intersection of east greenhill road.<\/p>\n traffic was temporarily rerouted to accommodate the reconstruction efforts.<\/p><\/div>\nroundabouts smooth out traffic flow, increase safety<\/span><\/h2>\n
stormwater analysis drives new sewer system<\/span><\/h2>\n
<\/a>