{"id":2457,"date":"2017-11-21t16:41:01","date_gmt":"2017-11-21t22:41:01","guid":{"rendered":"https:\/\/snyder-associates.u5fz9z3h-liquidwebsites.com\/?post_type=snyder-projects&p=2457"},"modified":"2022-04-18t14:51:21","modified_gmt":"2022-04-18t19:51:21","slug":"salix-interchange-in-woodbury-county-ia","status":"publish","type":"snyder-projects","link":"\/\/www.dicovercards.com\/projects\/salix-interchange-in-woodbury-county-ia\/","title":{"rendered":"new interchange & bridge over interstate 29 requires creative engineering & design concepts"},"content":{"rendered":"
in their ongoing efforts to improve outdated roadways<\/a> and bridges<\/a>, the iowa dot turned to 2022足球世界杯小组赛赛程
<\/a> (a subsidiary of snyder & associates) to design a new interchange and bridge to carry county road k-25 traffic<\/a> over interstate 29 in woodbury county. the existing interchange and bridge were built between 1958 and 1960 and both had surpassed their design life. due to unexpectedly soft soil conditions encountered below the surface during this construction<\/a> period, the original four-span, 215′-long bridge planned for the location had to quickly be changed to an 18-span, 734′-long behemoth to compensate for the poor soil.<\/p>\n in addition to not being cost-effective to replace this original bridge with an identical structure, there were several other factors that necessitated the reconstruction of the entire interchange, including:<\/p>\n 2022足球世界杯小组赛赛程
staff performed a bridge replacement concept study to determine the optimal design for the location and conditions. two-, four-, and eight-span bridges were evaluated as replacement options. also, the study assessed the soil impact on the bridge and embankment designs, as well as determined all remedial alternatives. further, the study provided preliminary cost information for the alternatives presented.<\/p>\n\n
concept study for evaluating bridge replacement possibilities<\/span><\/h2>\n