building & facility upgrades enhance learning options<\/strong><\/span><\/h2>\nat the elementary school level, improvements began with the demolition of the mcfarland primary school and additions and renovations to the neighboring conrad elvehjem early learning center. now renamed the conrad elvehjem primary school, these improvements brought kindergarten through second-grade students and staff together in one building with improved learning spaces.<\/p>\n
the waubesa intermediate school benefited from new classrooms, a cafeteria, a larger library, and special service space for occupational, physical, and speech therapy sessions. a new roof, windows, and doors, as well as extensive maintenance work to the plumbing, heating, and cooling systems, were also performed. new wiring was installed throughout the building to meet the school’s growing technology needs.<\/p>\n
located adjacent to the high school, indian mound middle school was the beneficiary of a new two-story classroom addition. additionally, multiple classrooms were renovated and the gymnasium was expanded.<\/p>\n
the most extensive renovations took place at mcfarland high school where a new performing arts center and swimming pool highlighted the improvements. the former swimming pool and auditorium were constructed in 1978 and no longer met the district\u2019s needs. the swimming pool addition features a 10-lane pool, additional spectator bleachers, expanded locker rooms, and improved accessibility. the old pool area was converted into a fitness center and weight room.<\/p>\n
the new performing arts center features expanded patron seating to 841-seats with improved accessibility, enhanced lighting and sound system, a larger stage, and a full fly loft. located on the backside of the school, the performing arts center and new pool benefited from the addition of an 81-stall parking lot for staff and building guests. this access point further developed to include a drop-off area, creating a new entrance for the additions. many of these new spaces incorporated into the renovations were designed not only for school use but also for other community activities after hours.<\/p>\n
a student resource center and additional classroom spaces were also added to the high school. a second story was constructed above the existing district office and the technology education area was renovated to better suit department needs. the majority of the district improvements were completed in time to reopen for the 2020-21 school year.<\/p>\n","protected":false},"excerpt":{"rendered":"
the snyder & associates engineering and 2022世界杯32强预选赛
team provided site development services for this multi-year project, as well as sports field design plans.<\/p>\n","protected":false},"featured_media":4894,"template":"","categories":[29,26],"project_categories":[113,82,34],"client_type":[59],"location":[69],"class_list":["post-2940","snyder-projects","type-snyder-projects","status-publish","has-post-thumbnail","hentry","category-land-development","category-世界杯足球比赛预选赛
-spaces","project_categories-education","project_categories-development","project_categories-athletic-facilities","client_type-k-12-schools","location-madison"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t\n\t \n\t \n\t \n\t \n\t \n\n\t\t\n