{"id":3737,"date":"2018-04-24t13:19:25","date_gmt":"2018-04-24t18:19:25","guid":{"rendered":"https:\/\/snyder-associates.u5fz9z3h-liquidwebsites.com\/?post_type=snyder-projects&p=3737"},"modified":"2022-05-25t14:47:58","modified_gmt":"2022-05-25t19:47:58","slug":"agricultural-rail-terminal","status":"publish","type":"snyder-projects","link":"\/\/www.dicovercards.com\/projects\/agricultural-rail-terminal\/","title":{"rendered":"development 2022世界杯32强预选赛 for agricultural rail terminal"},"content":{"rendered":"

new rail terminal\u00a0required innovative design<\/h2>\n

this project involved development 2022世界杯32强预选赛 <\/a> for a new rail terminal intended to receive\u00a0and send bulk fertilizer shipments.\u00a0 located near downtown st. joseph, missouri<\/a>, extensive coordination with the municipality<\/a>, servicing railroads, and project owners was required. the site was previously occupied by several railroads, many of which disappeared through bankruptcy or merger, making coordination with property\u00a0owners a challenge.<\/p>\n

to create the most cost-effective freight rates, accommodating unit trains with more than 100 cars of a single commodity was critical. this included bulk fertilizer shipments into the site as well as grain shuttle service for outbound commodities.<\/p>\n

\"train<\/a>

the project site provided challenges as it was located in highly congested area.<\/p><\/div>\n

the site is heavily constrained by existing streets<\/a>, railroad properties, and adjacent buildings<\/a>, requiring the\u00a0innovative design of new infrastructure<\/a>. the layout of new freight rail <\/a>infrastructure\u00a0was performed with long-term operation and efficiency\u00a0in mind.\u00a0despite site limitations, a preliminary design was developed to meet burlington northern santa fe (bnsf) railway unit train service requirements.<\/p>\n

after a lengthy analysis, bnsf determined the proposed facility design met its requirements and local crews could service the location. however, mainline capacity wasn’t available to service additional unit train demand in the near term. as a result, the project hasn’t been constructed.<\/p>\n","protected":false},"excerpt":{"rendered":"

new rail terminal\u00a0required innovative design this project involved development 2022世界杯32强预选赛 for a new rail terminal intended to receive\u00a0and send bulk fertilizer shipments.\u00a0 located near downtown st. joseph, missouri, extensive coordination with the municipality, servicing railroads, and project owners was required. the site was previously occupied by several railroads, many of which disappeared through bankruptcy or […]<\/p>\n","protected":false},"featured_media":7686,"template":"","categories":[29,27],"project_categories":[82,41,45],"client_type":[57],"location":[65],"class_list":["post-3737","snyder-projects","type-snyder-projects","status-publish","has-post-thumbnail","hentry","category-land-development","category-transportation","project_categories-development","project_categories-industrial","project_categories-rail","client_type-owner-developer","location-st-joseph"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t\n\t\n\t\n\t\n\t\n\t\n\n\t\t\n