{"id":5266,"date":"2019-04-12t16:32:45","date_gmt":"2019-04-12t21:32:45","guid":{"rendered":"https:\/\/snyder-associates.u5fz9z3h-liquidwebsites.com\/?post_type=snyder-projects&p=5266"},"modified":"2024-09-16t08:04:16","modified_gmt":"2024-09-16t13:04:16","slug":"stream-realignment-for-roadway-extension-des-moines","status":"publish","type":"snyder-projects","link":"\/\/www.dicovercards.com\/projects\/stream-realignment-for-roadway-extension-des-moines\/","title":{"rendered":"stream realignment required for roadway extension in west des moines"},"content":{"rendered":"
the stagecoach drive extension over sugar creek in west des moines extended a minor arterial roadway to serve a rapidly-growing residential area. stagecoach drive is currently a two-lane road, which is planned for expansion to five lanes as future conditions warrant. ultimately, city traffic models<\/a> predict that stagecoach drive will carry up to 23,000 vehicles per day, creating the need for additional lanes.<\/p>\n as land\u00a0development<\/a> in west des moines pushes to the west side of sugar creek, a bridge crossing<\/a> on stagecoach drive was included in the city\u2019s comprehensive plan<\/a>. with stagecoach drive already constructed 500-feet to the east side of sugar creek, options to cross the creek were limited. the desired crossing location was near a sharp meander in the creek where severely eroded banks posed a challenge.<\/p>\n after completing an alternatives analysis and coordinating with the u.s. army corps of engineers (usace), our design team determined the best solution was a single span, 135′-long, 30′-wide, pretensioned prestressed concrete beam bridge with a five’-wide sidewalk on the south side. as future traffic demand warrants, the bridge can be widened to provide 660′ of additional roadway with a 10′-wide trail<\/a> on the north side.<\/p>\nmitigation options for stream realignment<\/span><\/h2>\n