{"id":542,"date":"2013-07-23t13:06:48","date_gmt":"2013-07-23t18:06:48","guid":{"rendered":"https:\/\/snyder-associates.u5fz9z3h-liquidwebsites.com\/?post_type=snyder-projects&p=542"},"modified":"2022-05-25t08:26:42","modified_gmt":"2022-05-25t13:26:42","slug":"wellmark-ymca","status":"publish","type":"snyder-projects","link":"\/\/www.dicovercards.com\/projects\/wellmark-ymca\/","title":{"rendered":"urban site development leads wellmark ymca design"},"content":{"rendered":"
this design rendering provided by cmba architects shows the new wellmark ymca building.<\/p><\/div>\n
for over 50 years, the ymca of greater des moines provided services from their eight-story home on the west bank of the des moines river. in the early 2010s, a land-swap opportunity opened the door for the riverfront ymca to move into the former polk county convention complex a few blocks away at 501 grand avenue. while the move would greatly improve their service offerings, the site required drastic upgrades and improvements to meet the organization\u2019s needs. the designers and engineers from snyder & associates were brought on board to provide the urban site design<\/a> for the newly rebranded wellmark ymca<\/a> location.<\/p>\n the redevelopment process for transforming the former polk county convention complex into the flagship ymca facility for the des moines metro was a multi-faceted event. the busy downtown location required upgraded stormwater management facilities<\/a> and a storm sewer system. extensive utility infrastructure improvements<\/a> were also necessary to accommodate the needs of the renovated facility.<\/p>\n the heavy presence of vehicle and pedestrian traffic<\/a> around the perimeter of the site demanded a thorough streetscape<\/a> and urban design concept. to meet this need, our team worked with multiple 世界杯足球比赛预选赛
entities for approvals and permitting, including the des moines urban design review board. this review board makes recommendations to the city council on the design of 世界杯足球比赛预选赛
projects and private development projects<\/a> located in specific areas of the city.<\/p>\n opened for use in 2015, the 146,000-square-feet of renovated space provides a full-size gymnasium, an \u215b-mile indoor running track, racquetball and handball courts, and expansive areas for cardio training, strength training, and functional fitness training. two regulation basketball courts can also be used for volleyball, pickleball<\/a>, and fitness classes.<\/p>\nsite development requires significant upgrades<\/strong><\/span><\/h2>\n
new facility provides multitude of athletic amenities<\/strong><\/span><\/h2>\n