{"id":555,"date":"2013-07-23t13:17:04","date_gmt":"2013-07-23t18:17:04","guid":{"rendered":"https:\/\/snyder-associates.u5fz9z3h-liquidwebsites.com\/?post_type=snyder-projects&p=555"},"modified":"2024-08-12t14:19:27","modified_gmt":"2024-08-12t19:19:27","slug":"winterset-streetscape","status":"publish","type":"snyder-projects","link":"\/\/www.dicovercards.com\/projects\/winterset-streetscape\/","title":{"rendered":"winterset streetscape design creates cohesive 世界杯足球比赛预选赛 space"},"content":{"rendered":"
when most people think of winterset, iowa<\/a>, an image of the iconic \u201ccovered bridges\u201d that dot the surrounding landscape usually comes to mind. however, the historic downtown region, home to the madison county courthouse, is usually a close second.<\/p>\n when the winterset city council and the local chamber of commerce approached planners with snyder & associates to recommend infrastructure upgrades, discussions mainly centered around improving street lighting, traffic signals<\/a>, and electrical services in a twelve-block area surrounding the town square. during our team\u2019s data collection efforts of the area\u2019s storm sewer and water service utilities, it quickly became clear that city leaders also had a \u201cwish list\u201d of additional streetscape improvements they wanted our team to tackle.<\/p>\n to create a comprehensive streetscape design that met our client\u2019s needs, the snyder & associates design team began with an in-depth study of existing conditions. during this time, 14 underground utility vaults and sidewalk openings were investigated, along with current ada accessibility<\/a> deficiencies and stormwater management issues. the original mismatched light poles, outdated lighting technology, and traffic signals were also among the streetscape elements slated for improvement.<\/p>\n it was determined that a complete roadway reconstruction, including storm sewer upgrades<\/a>, would be necessary to repair the problem areas and eliminate ponding and poor drainage in the project area. it was also found that extensive filing and reinforcement measures would need to be taken to strengthen the underground utility vaults and increase the structural integrity of the sidewalks above. new and updated electrical wiring would also be routed through the vaults for the utilities in the area.<\/p>\nmismatched & outdated technology leads to extensive makeover<\/strong><\/span><\/h2>\n
multimodal accommodations & improved aesthetic appeal<\/strong><\/span><\/h2>\n