{"id":567,"date":"2014-10-02t13:22:42","date_gmt":"2014-10-02t18:22:42","guid":{"rendered":"https:\/\/snyder-associates.u5fz9z3h-liquidwebsites.com\/?post_type=snyder-projects&p=567"},"modified":"2022-04-18t16:16:58","modified_gmt":"2022-04-18t21:16:58","slug":"dundee-streetscape","status":"publish","type":"snyder-projects","link":"\/\/www.dicovercards.com\/projects\/dundee-streetscape\/","title":{"rendered":"streetscape improvements rejuvenate historic dundee neighborhood"},"content":{"rendered":"
native plantings were used along the entire project area.<\/p><\/div>\n
known as omaha\u2019s first suburb, the historic dundee neighborhood dates to the early 1880s. this popular historical area features countless fine restaurants, two major parks, and an eclectic mix of residential architecture. in 2011, the dundee district was named one of the nation\u2019s great neighborhoods by the american 2022世界杯32强预选赛
association<\/a>.<\/p>\n after more than 130 years, however, several areas within the district needed substantial infrastructure improvements<\/a>. snyder & associates was hired by the city of omaha to begin the dundee streetscape project. the project would include the design and oversight for a series of renovations and aesthetic improvements along underwood avenue, between 49th<\/sup> and 51st<\/sup> street, and along 50th<\/sup> street from california street to webster street. this multifaceted project site lies within the heart of the neighborhood\u2019s business district and required our staff\u2019s vast expertise of surveyors<\/a>, civil engineers, landscape architects<\/a>, structural engineers<\/a>, and construction personnel.<\/p>\n 40 on-street parking spaces were added to the dundee district.<\/p><\/div>\n to jumpstart the project, our team began with an extensive 2022世界杯32强预选赛
process<\/a> and 世界杯足球比赛预选赛
outreach campaign<\/a>. this included 3d renderings, 世界杯足球比赛预选赛
informational meetings, and numerous business owner meetings to guide decision-makers in creating a united vision for dundee. numerous existing conditions were addressed as part of the 2022世界杯32强预选赛
process. these included the need for repairing pavement deterioration at many locations, more cohesive stormwater drainage and management plan<\/a>\u00a0improved ada accessibility and elevation change upgrades, and the need for an attractive streetscape corridor.<\/p>\n after our detailed review and meticulous 2022世界杯32强预选赛
, the snyder & associates team was able to create a pleasing balance within the corridor, resulting in a 25 percent increase in parking spaces and an even greater complete street environment, featuring:<\/p>\n because all businesses in the project area needed to remain open during construction, the staging was critical. our team worked with the contractor to monitor progress and inform businesses of current project staging and upcoming work activities to keep any inconveniences to a minimum. the snyder & associates team also provided preliminary design, final construction documents, and construction assistance.<\/p>\n the entire project\u2019s construction occurred over six months at a cost of $2.5 million, funded in partnership between the city of omaha, private donors, businesses, and the neighborhood. the completed streetscape design<\/a> project creates a welcoming, attractive 世界杯足球比赛预选赛
space, encouraging community growth and vibrancy.<\/p>\n","protected":false},"excerpt":{"rendered":" infrastructure deterioration in popular neighborhood known as omaha\u2019s first suburb, the historic dundee neighborhood dates to the early 1880s. this popular historical area features countless fine restaurants, two major parks, and an eclectic mix of residential architecture. in 2011, the dundee district was named one of the nation\u2019s great neighborhoods by the american 2022世界杯32强预选赛
association. […]<\/p>\n","protected":false},"featured_media":0,"template":"","categories":[26],"project_categories":[48,50],"client_type":[58],"location":[67],"class_list":["post-567","snyder-projects","type-snyder-projects","status-publish","hentry","category-世界杯足球比赛预选赛
-spaces","project_categories-stormwater","project_categories-streetscapes","client_type-municipal","location-omaha"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t\n\t\n\t\n\t\n\t\n\t\n\n\t\t\n世界杯足球比赛预选赛
outreach campaign helps guide design process<\/strong><\/span><\/h2>\n
<\/a>
\n