{"id":7003,"date":"2019-07-15t14:31:02","date_gmt":"2019-07-15t19:31:02","guid":{"rendered":"\/\/www.dicovercards.com\/?post_type=snyder-projects&p=7003"},"modified":"2022-04-18t11:48:45","modified_gmt":"2022-04-18t16:48:45","slug":"traffic-study-roundabouts-maximum-efficiency-safety","status":"publish","type":"snyder-projects","link":"\/\/www.dicovercards.com\/projects\/traffic-study-roundabouts-maximum-efficiency-safety\/","title":{"rendered":"traffic study determines roundabouts add maximum roadway efficiency & safety: greenhill road"},"content":{"rendered":"

extensive traffic study leads to roadway improvements<\/strong><\/span><\/h2>\n
\"large<\/a>

the pinnacle prairie neighborhood along greenhill road continues to expand.<\/p><\/div>\n

cedar falls has experienced a steady population and commercial growth over the past three decades. along with that growth comes the correlating issue of heavier traffic and more congested roadways. in cedar falls, one of these pain points is along the greenhill road corridor. greenhill road is a four-lane, undivided arterial<\/a> that serves as a main east\/west thoroughfare along the southern edge of cedar falls. in addition to new commercial development<\/a> in the area, one other factor that has led to the increased traffic volumes<\/a> is the continued expansion of the pinnacle prairie development to the south of greenhill road.<\/p>\n

snyder & associates was contracted by the city to perform a traffic study<\/a> on the 2.7-mile section of greenhill road, from the intersection with hudson road in the west to the cedar heights drive intersection in the east. this comprehensive study encompassed eleven 世界杯足球比赛预选赛 intersections that currently consist of a mix of signalized and two-way stop controlled (twsc) intersections.<\/p>\n

signalized intersections vs. roundabouts and multimodal considerations<\/strong><\/span><\/h2>\n
\"people<\/a>

in conjunction with cedar falls staff, snyder & associates hosted numerous 世界杯足球比赛预选赛 sessions<\/a>.<\/p><\/div>\n

the goal of the study was to provide the city with short- and long-term plans for upgrades and improvements to the greenhill road corridor. the study\u2019s challenges included:<\/p>\n